Question No : 5
Which list of elements below are the most important to be evaluated
and coordinated during the planning phase of a major shutdown of your
operating area (i.e. annual turnaround)?
Options
A. Historical turnaround maintenance
days, operations desired work list, prior turnaround work lists
B. Available turnaround budget, equipment condition, budgeted down-days
C. Condition and
remaining life of critical equipment, value of production throughput,
labor and materials availability and cost
D. Heavy lifting equipment availability, labor cost
and availability, operations requested down-days
Answer: A